Higher fiber core counts within data centers was now being increased from 288 to 864/1152 or higher within facilities and, more importantly, between campus sites. Colocation companies were trying to mitigate the lack of infrastructure between sites by installing new, advanced connectivity cables such as the Fujikura SpiderWeb Ribbon® (SWR). Higher capacity and smaller cable diameters assisted in the rollout of inter-campus connectivity, providing a better ROI for the data centers on installation and termination time, which in turn helped the Colocation providers’ customers in other sites connect directly to the cloud providers.
Maxamize
- Port capacity
- Fiber count in new or existing ducts and pathways
- Network performance
- Cable management pathway routes
- Installation options
Minimize
- Solution deployment
- Cabling installation time
- Footprint in distribution areas
- Lead time (factory to site)
- Operational costs
Simplify
- Fiber management
- Network architecture
- Installations of high fiber counts
- Moves, Adds and Changes